Utilities › Electrical Distribution System

Electrical Distribution System

Electrical power is currently provided to the entire complex through two substations with 115 kilovolts (kV) and two transformers/busses to 34.5 kV. Power is distributed by National Grid.

Overall demand at the Park exceeds 10 Mw with Toray Plastics, Ocean State Job Lot, Senesco and General Dynamics being the largest users. Cost of service rates are based on a G 62 rate from published tariff listed on the National Grid website.